Kurume
Hospital - Japan
Showing off Coolerado's modular system and scalability,
Tohoku Earth Clean built and installed a 17,500 CFM cooler that uses
72 Coolerado heat and mass exchangers to cool air that has been dried by
a desiccant system. The fresh, dry, 73-degree Fahrenheit
conditioned air is delivered to the hospital rooms.
Earth Clean has also installed many other hybrid
Coolerado systems in Japan for:
McDonalds Restaurant
7-Eleven Convenience Store
Sunmart Supermarket
Rasera Department Store
Circle-K Convenience Store Coffee Shop
more pictures and details>
United States
Department of Energy (DOE)
National Renewable Energy Laboratory (NREL)
Golden, Colorado
NREL purchased a Coolerado C600 to perform some short and
long range testing . . . as well as cool its conference room and some offices.
pictures and details>
Colorado
School of Mines (Mines)
Golden, Colorado
Mines' combined cooling and heating unit delivers 9 tons of
cooling capacity with a variable speed fan, motorized dampers, and more!
pictures and details>
Bradford Publishing
Denver,
Colorado
The
Coolerado Cooler for this historic downtown building delivers 16 tons of
cooling and has some added features.
pictures and details>
Denver,
Colorado - Mount Saint Vincent Home
A
Coolerado Cooler was sized to cool a computer lab
which generates a lot of heat. Then the school staff decided
to add ducts to cool two large classrooms as well.
pictures and details>
Testimonial - Would the
added heat from the two large classrooms in this poorly insulated 1883
building be too much for the Coolerado Cooler?
A letter from Sister la Vonne>
Coming into the
Spotlight - Noteworthy air
conditioners in fabrication:
●
University of California, Institute for Crustal
Studies Seismic Monitoring Station - This remote hut has an
oversized roof mounted with photovoltaic panels to collect energy to
power the earthquake monitoring equipment located inside.
Coolerado is building a cooler that will deliver about a ton of cooling
and will only draw 36 watts of power.